Home/Answers/Helical piers
FOUNDATION COST LAB / Helical piers

How to Set Up Helical piers

To set up Helical piers, confirm the input format/device, choose output settings, then run a small batch.

Updated 2026-11-03About 3 minLocal test
Quick answer

To set up Helical piers, confirm the input format/device, choose output settings, then run a small batch. Helical piers depend on soil/depth/load; fit light/medium.

Why it matters

Validate on a small sample before running the whole batch.

Soil.

Step by step

  1. Assess structure/drainage/cracks before signing.
  2. Separate piers/waterproofing/drainage/rebuild/permits.
  3. Get 2-3 quotes + engineering plans.
  4. Contract states scope/warranty/monitoring/payment.

Common mistakes

  • Cracks only, no drainage/structure check.
  • Hiring unqualified crews without engineering.
  • Not comparing pier methods/warranties.
  • Ignoring permits/monitoring.

Checklist

  • Structure/drainage/cracks/settlement.
  • Piers/waterproofing/drainage/rebuild.
  • Engineering/permits/quotes.
  • Warranty/monitoring/payment.
  • Insurance/resale/budget.

Who it is for

If this is your first Helical piers, narrow by Soil. and Depth. first, then look at specific models.

Key facts

  • Soil.
  • Depth.
  • Load.

FAQ

How do I set up Helical piers?

To set up Helical piers, confirm the input format/device, choose output settings, then run a small batch. Helical piers depend on soil/depth/load; fit light/medium.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: FEMA