After Settlement, spot-check the output, then decide whether to delete/archive the original; keep a backup. Settlement depends on differential/soil/drainage; may need underpinning.
Why it matters
A backup lets you roll back if the output is wrong.
Differential.
Step by step
- Assess structure/drainage/cracks before signing.
- Separate piers/waterproofing/drainage/rebuild/permits.
- Get 2-3 quotes + engineering plans.
- Contract states scope/warranty/monitoring/payment.
Common mistakes
- Cracks only, no drainage/structure check.
- Hiring unqualified crews without engineering.
- Not comparing pier methods/warranties.
- Ignoring permits/monitoring.
Checklist
- Structure/drainage/cracks/settlement.
- Piers/waterproofing/drainage/rebuild.
- Engineering/permits/quotes.
- Warranty/monitoring/payment.
- Insurance/resale/budget.
Who it is for
If this is your first Settlement, narrow by Differential. and Soil. first, then look at specific models.
Key facts
- Differential.
- Soil.
- Drainage.
FAQ
What should I do after Settlement?
After Settlement, spot-check the output, then decide whether to delete/archive the original; keep a backup. Settlement depends on differential/soil/drainage; may need underpinning.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: FEMA